When it comes to pricing, Henrybuilt uses old math. This takes the risk of material and other cost fluctuations off your and your client’s plate.
It starts with scope-based pricing based on your design intent, communicating the cost of our scope at the time of decision-making, rather than after design when things outside of your control can change the math.
Once we are hired, the Henrybuilt product pricing level is shielded from increases in material and labor costs, as well as inflation costs resulting from delays in the project and other environmental factors, for 16 months. This provides a window of up to 12 months in design followed by 4 months for production and delivery.
Changes to the scope of the project during the 12-month design window will be offered at the original pricing level, even if price increases have occurred since then. On the flip side, decrease in scope is reflected in a reduced final payment.